The Committee considered an application for demolition of the existing buildings and redevelopment to form 31 retirement apartments for the elderly including communal facilities, access, car parking and landscaping. RESOLVED that planning permission be GRANTED subject to: (a) completion of all documentation required to create a planning obligation under Section 106 of the Town and Country Planning Act 1990 (as amended) to secure: (i) a contribution of £240,000 towards the provision of affordable housing upon commencement of development;
(ii) a clawback mechanism to provide that, in the event that legislation which would prevent the charging of ground rents on the application scheme is in force at the point of first occupation, the council covenants to return a sum of up to maximum £103,508 to the applicant within 30 days; and
(iii) the Council’s legal costs in preparing the agreement
In the event that a satisfactorily completed obligation is not received by 31 June 2018 or such longer period as may be agreed, the Head of Places and Planning be authorised to refuse permission for the following reason: The proposal fails to provide an agreed contribution to fund affordable housing provision within the Borough of Reigate & Banstead, and is therefore contrary to policy CS15 of the Reigate and Banstead Core Strategy 2014. (b) the following conditions: 1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason:
To comply with Section 91(1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.
2. The development hereby permitted shall be carried out in accordance with the following approved plans:
Plan Type Reference Version Date Received
Site Layout Plan 20071RG P02 22.09.2017
Landscaping Plan 20071RG RF10 22.09.2017
Site Layout Plan 20071RG P11 22.09.2017
Elevation Plan 20071RG P09 A 01.12.2017
Elevation Plan 20071RG P08 A 01.12.2017
Elevation Plan 20071RG P07 A 01.12.2017
Roof Plan 20071RG P06 A 13.12.2017
Floor Plan 20071RG P05 A 13.12.2017
Floor Plan 20071RG P04 A 13.12.2017
Floor Plan 20071RG P03 A 13.12.2017
Location Plan 20071RG P01 22.09.2017
Arb/Tree Protection Plan 17192-BT2 E 04.10.2017
Other Plan SU01 04.10.2017
Elevation Plan EL 01 13.10.2017
Floor Plan UNNUMBERED 13.10.2017
Floor Plan 32-34-GND 13.10.2017
Floor Plan 36-38-1ST 13.10.2017
Floor Plan 36-38-GND 13.10.2017
Floor Plan 40-42-1ST 13.10.2017
Floor Plan 40-42-GND 13.10.2017
Reason:
To define the permission and ensure the development is carried out in accord with the approved plans and in accordance with National Planning Practice Guidance.
3. No development shall commence including groundworks preparation and demolition until all related arboricultural matters including tree protection measures, pre commencement meeting, arboricultural supervision and monitoring are implemented in accordance with the approved details contained in the Arboricultural Assessment and Method Statement dated 26th September 2017 reference 17192-AA-AN Tree Protection Plan Barrell plan reference 17192-BT2 and the Manual for Managing Trees on Development Sites compiled by barrel Tree Consultancy.
Reason:
To ensure good arboricultural practice in the interests of the maintenance of the character and appearance of the area and to comply with policies Pc4 and Ho9 of the Reigate and Banstead Borough Local Plan 2005 and the recommendations within British Standard 5837.
4. No development shall commence until a Construction Transport Management Plan, to include details of:
(a) parking for vehicles of site personnel, operatives and visitors;
(b) loading and unloading or plant and materials;
(c) storage of plant and materials;
(d) provision of boundary hoarding behind any visibility zones;
(e) HGV deliveries and hours of operation; and
(f) measures to prevent the deposit of materials on the highway
has been submitted to and approved in writing by the Local Planning Authority. Only the approved details shall be implemented during the construction of the development.
Reason:
In order that the development should not prejudice highway safety nor cause inconvenience to other highway users to satisfy policies Mo5 and Mo7 of the Reigate and Banstead Borough Local Plan 2005 and the objectives of the NPPF 2012.
5. No development shall commence on site until a scheme for the landscaping and replacement tree planting of the site including the retention of existing landscape features has been submitted and approved in writing by the Local Planning Authority. Landscaping schemes shall include details of hard landscaping, planting plans, written specifications (including cultivation and other operations associated with tree, shrub, and hedge or grass establishment), schedules of plants, noting species, plant sizes and proposed numbers/densities and an implementation programme.
All hard and soft landscaping work shall be completed in full accordance with the approved scheme, prior to occupation or use of the approved development or in accordance with a programme agreed in writing with the Local Planning Authority.
All new tree planting shall be positioned in accordance with guidelines and advice contained in the current British Standard 5837: Trees in relation to construction.
Any trees shrubs or plants planted in accordance with this condition which are removed, die or become damaged or become diseased within five years of planting shall be replaced within the next planting season by trees, and shrubs of the same size and species.
Reason:
To ensure good arboricultural and landscape practice in the interests of the maintenance of the character and appearance of the area and to comply with policies Pc4 and Ho9 of the Reigate and Banstead Borough Local Plan 2005.
6. No development shall take place until the detailed design of the surface water drainage scheme has been submitted to an approved in writing by the Local Planning Authority. Such details should include:
(a) a design that follows the principles set out in the approved drainage strategy (Drainage Impact Assessment dated September 2017 by Peter Brett Associates);
(b) detailed drawings showing drainage layout, long or cross sections of each drainage element, pipe sizes and invert and cover levels;
(c) appropriate calculations to the elements above showing how the national SuDS requirements have been met (if different from the approved strategy), including filtration rates;
(d) details of outline construction phasing and how surface water and any associated pollution will be dealt with during the construction of the development and how any on site drainage systems will be protected and maintained;
(e) details of who will manage the drainage elements and their associated maintenance regimes; and
(f) details of where any exceedance flows (i.e. rainfall greater than design or flows following blockages) would run to, avoiding risks to people and property.
Reason:
To ensure that the development is served by an adequate and approved means of drainage which would not increase flood risk on or off site and is suitably maintained throughout its lifetime to comply with Policy Ut4 of the Reigate and Banstead Borough Local Plan 2005, Policy CS10 of the Core Strategy 2014 and the requirements of non-statutory technical standards.
7. Notwithstanding the approved plans, no above ground works on the residential buildings hereby approved shall take place until written details of the materials to be used in the construction of the external surfaces, including fenestration and roof, have been submitted to and approved in writing by the Local Planning Authority, and on development shall be carried out in accordance with the approved details.
Reason:
To ensure that a satisfactory external appearance is achieved of the development with regard to Reigate and Banstead Borough Local Plan 2005 policies Ho9 and Ho13.
8. The development hereby approved shall be carried out in accordance with the recommendations for mitigation, construction practice and ecological enhancement – including in relation to bats – identified in the Preliminary Ecological Appraisal by ECOSA (report reference 3232.F0 dated 2nd October 2017).
Reason:
In order to preserve and enhance the wildlife and habitat interest on the site and ensure species present on the site are afforded appropriate protection during construction works with regard to Reigate and Banstead Borough Local Plan 2005 policy Pc2G.
9. Notwithstanding the approved plans, the development hereby approved shall not be first occupied unless and until the proposed vehicular access to Prices Lane has been constructed with kerbed radii and tactile paving at the pedestrian crossing points and pedestrian visibility measuring two metres from the sides of the accesses by two metres from the back of the footway in accordance with a scheme to be submitted to and approved in writing by the Local Planning Authority. Thereafter the pedestrian visibility zones shall be kept permanently clear of any obstruction over 0.6m high above the footway surface.
Reason:
In order that the development should not prejudice highway safety nor cause inconvenience to other highway users to satisfy policies Mo5 and Mo7 of the Reigate and Banstead Borough Local Plan 2005 and the objectives of the NPPF 2012.
10. The development hereby approved shall not be first occupied until the space has been laid out within the site in accordance with the approved plans for vehicles to be parked and for vehicles to turn so that they may enter and leave the site in forward gear. Thereafter the parking/turning areas shall be retained and maintained for their designated purpose.
Reason:
In order that the development should not prejudice highway safety nor cause inconvenience to other highway users to satisfy policies Mo5 and Mo7 of the Reigate and Banstead Borough Local Plan 2005 and the objectives of the NPPF 2012.
11. The development hereby approved shall not be first occupied until facilities for the secure, accessible storage of a minimum of 14 bicycles have been provided within the site in accordance with a scheme to be submitted to and approved in writing by the Local Planning Authority. Thereafter, the bicycle storage facility shall be retained and maintained for its designated purpose.
Reason:
To ensure that the development would promote sustainable transport choices with regard to Policy CS17 of the Reigate and Banstead Core Strategy 2014 and in recognition of Section 4 “Promoting Sustainable Transport” in the National Planning Policy Framework 2012
12. The development hereby approved shall not be first occupied unless and until the existing accesses to the site from Prices Lane have been permanently closed and any kerbs, verge and/or footway fully reinstated.
Reason:
In order that the development should not prejudice highway safety nor cause inconvenience to other highway users to satisfy policies Mo5 and Mo7 of the Reigate and Banstead Borough Local Plan 2005 and the objectives of the NPPF 2012.
13. The development hereby approved shall not be first occupied until the external buggy/mobility scooter store has been provided in accordance with a scheme to be submitted to and approved in writing by the Local Planning Authority. Thereafter the approved above facility shall be retained and maintained for its designated purpose.
Reason:
To ensure that a satisfactory external appearance is achieved of the development with regard to Reigate and Banstead Borough Local Plan 2005 policies Ho9 and Ho13.
14. The development hereby approved shall not be first occupied until details of external lighting within the site have been submitted to and approved in writing by the Local Planning Authority. The lighting shall be installed prior to occupation and thereafter maintained in accordance with the approved details.
Reason:
To ensure that a satisfactory external appearance is achieved of the development with regard to Reigate and Banstead Borough Local Plan 2005 policies Ho9 and Ho13.
15. The development hereby approved shall not be first occupied until refuse storage facilities have been provided in accordance with the approved plans. The said facilities shall thereafter be retained exclusively for its designated purpose.
Reason:
To ensure that a satisfactory external appearance is achieved of the development with regard to Reigate and Banstead Borough Local Plan 2005 policies Ho9 and Ho13.
16. The development hereby approved shall not be first occupied unless and until a verification report demonstrating that the sustainable urban drainage system has been constructed as per the agreed scheme has been submitted to and approved in writing by the Local Planning Authority. The validation report should be carried out by a qualified drainage engineer.
Reason:
To ensure that the development is served by an adequate and approved means of drainage which would not increase flood risk on or off site and is suitably maintained throughout its lifetime to comply with Policy Ut4 of the Reigate and Banstead Borough Local Plan 2005, Policy CS10 of the Reigate and Banstead Core Strategy 2014 and the requirements of non-statutory technical standards.
17. No plant or machinery, including fume extraction, ventilation and air conditioning, which may be required by reason of granting this permission, shall be installed within or on the building without the prior approval in writing of the Local Planning Authority. Any approved plant or machinery shall be installed and thereafter maintained in accordance with the approved details and any manufacturer’s recommendations.
Reason:
To ensure that a satisfactory external appearance is achieved of the development and to safeguard the amenities of neighbouring occupiers with regard to Reigate and Banstead Borough Local Plan 2005 policies Ho9 and Ho13.
18. The first floor and second floor windows in the east side elevation (Elevation F-F) of the development hereby permitted shown as serving apartments 15, 16, 25 and 26 on the approved plans shall be glazed with obscured glass which shall be fixed shut, apart from a top hung opening fanlight whose cill height shall not be less than 1.7 metres above internal floor level, and shall be maintained as such at all times.
Reason:
To ensure that the development does not affect the amenity of the neighbouring property by overlooking with regard to Reigate and Banstead Borough Local Plan 2005 policy Ho9.
19. The occupation of the residential dwellings hereby approved (excluding any on-site staff) shall be restricted at all times to persons 60 years old and above, with the exception of persons 55 years old and above who are a spouse or partner of an occupant 60 years old and above.
Reason:
To ensure the development caters for those requiring sheltered/retirement housing in order to maintain an appropriate choice of housing with regard to Policy CS14 of the Reigate and Banstead Core Strategy 2014.
INFORMATIVES
1. Your attention is drawn to the safety benefits of installing sprinkler systems as an integral part of new development. Further information is available at www.firesprinklers.info. 2. The applicant is advised that prior to the occupation of the development, adequate provision should be made for waste storage and collection. You are advised to contact the Council’s Recycling and Cleansing team to discuss the required number and specification of wheeled bins on rc@reigate-banstead.gov.uk or on the Council’s website at http://www.reigate-banstead.gov.uk/info/20051/commercial_waste. 3. Your attention is drawn to the benefits of using the Secured by Design award scheme. 4. You are advised that the Council will expect the following measures to be taken during any building operations to control noise, pollution and parking:
(a) Work that is audible beyond the site boundary should only be carried out between 08:00hrs to 18:00hrs Monday to Friday, 08:00hrs to 13:00hrs Saturday and not at all on Sundays or any Public and/or Bank Holidays;
(b) The quietest available items of plant and machinery should be used on site. Where permanently sited equipment such as generators are necessary, they should be enclosed to reduce noise levels;
(c) Deliveries should only be received within the hours detailed in (a) above;
(d) Adequate steps should be taken to prevent dust-causing nuisance beyond the site boundary. Such uses include the use of hoses to damp down stockpiles of materials, which are likely to generate airborne dust, to damp down during stone/slab cutting; and the use of bowsers and wheel washes;
(e) There should be no burning on site;
(f) Only minimal security lighting should be used outside the hours stated above; and
(g) Building materials and machinery should not be stored on the highway and contractors’ vehicles should be parked with care so as not to cause an obstruction or block visibility on the highway.
Further details of these noise and pollution measures can be obtained from the Council’s Environmental Health Services Unit. In order to meet these requirements and to promote good neighbourliness, the Council recommends that this site is registered with the Considerate Constructors Scheme - www.ccscheme.org.uk/index.php/site-registration. 5. The permission hereby granted shall not be construed as authority to carry out any works on the highway or any works that may affect a drainage channel/culvert or water course. The applicant is advised that a permit and, potentially, a Section 278 agreement must be obtained from the Highway Authority before any works are carried out on any footway, footpath, carriageway, verge or other land forming part of the highway. All works on the highway will require a permit and an application will need to submitted to the County Council's Street Works Team up to 3 months in advance of the intended start date, depending on the scale of the works proposed and the classification of the road. Please see: http://www.surreycc.gov.uk/roads-and-transport/road-permits-and-licences/the-traffic-management-permit-scheme 6. The applicant is also advised that Consent may be required under Section 23 of the Land Drainage Act 1991. Please see www.surreycc.gov.uk/people-and-community/emergency-planning-and-community-safety/flooding-advice. 7. The developer is reminded that it is an offence to allow materials to be carried from the site and deposited on or damage the highway from uncleaned wheels or badly loaded vehicles. The Highway Authority will seek, wherever possible, to recover any expenses incurred in clearing, cleaning or repairing highway surfaces and prosecutes persistent offenders. (Highways Act 1980 Sections 131, 148, 149). 8. When a temporary access is approved or an access is to be closed as a condition of planning permission an agreement with, or licence issued by, the Highway Authority Local Highways Service will require that the redundant dropped kerb be raised and any verge or footway crossing be reinstated to conform with the existing adjoining surfaces at the developers expense. 9. A pedestrian inter-visibility splay of 2m by 2m shall be provided on each side of the access, the depth measured from the back of the footway and the widths outwards from the edges of the access. No fence, wall or other obstruction to visibility between 0.6m and 2m in height above ground level shall be erected within the area of such splays. 10. The developer is advised that as part of the detailed design of the highway works required by the above condition(s), the County Highway Authority may require necessary accommodation works to street lights, road signs, road markings, highway drainage, surface covers, street trees, highway verges, highway surfaces, surface edge restraints and any other street furniture/equipment. 11. The use of a suitably qualified arboricultural consultant is essential to provide acceptable supervision and monitoring in respect of the arboricultural issues in respect of the above condition. All works shall comply with the recommendations and guidelines contained within British Standard 5837. 12. The use of landscape/arboricultural consultant is considered essential to provide acceptable submissions in respect of the above relevant conditions. Replacement planting of trees and shrubs shall be in keeping with the character and appearance of the locality. There is an opportunity to incorporate structural landscape trees into the scheme to provide for future amenity and long term continued structural tree cover in this area. It is expected that the replacement structural landscape trees will be of semi mature /Advanced Nursery Stock sizes with initial planting heights of not less than 6m 4.5m with girth measurements at 1m above ground level in excess of 20/25cm and 16/18cm. 13. The applicant is encouraged to provide renewable technology within the development hereby permitted in order to reduce greenhouse gas emissions.
|