Meeting documents

Planning Committee
Wednesday, 4th October, 2017 7.30 pm

Date:
Wednesday, 4th October, 2017
Time:
7.30 pm
Place:
New Council Chamber, Town Hall, Reigate
 

Attendance Details

Present:
Councillors: Mark Brunt (Chairman); Rosemary Absalom†, Derek Allcard, Michael Blacker, Graeme Crome, Julian Ellacott, Zully Grant-Duff, James King, Steve Kulka, Steve McKenna, Simon Parnall, Jamie Paul, David Powell, Dorothy Ross-Tomlin†, Michael Selby, Christian Stevens, Barbara Thomson and Christopher Whinney†

† Substitute
Also Present:
Councillors Jonathan Essex and Brian Stead
Min NoDescriptionResolution
Part I
41 MINUTES

RESOLVED that the minutes of the meeting held on 6 September 2017 be confirmed as a correct record and signed.

42 APOLOGIES FOR ABSENCE AND SUBSTITUTES

Apologies for absence were received from Councillors Pay (substitute: Councillor Absalom), Mrs Turner (substitute: Councillor Mrs Ross Tomlin), and Mrs Bray (substitute: Councillor Whinney).

 

 

Note: Apologies were received from Councillor Stephenson after the meeting because he had been unavoidably detained.
 

43 DECLARATIONS OF INTEREST

Councillor Blacker declared a disclosable pecuniary interest in agenda items 14 and 15 (17/01916/HHOLD and 17/01920/HOLD) because his company was agent for the applicant in each case.

 

Councillor Crome declared a non-pecuniary interest in agenda item 14 (17/01916/HHOLD) because the applicant was a near neighbour.

 

Councillor Brunt declared a non-pecuniary interest in agenda item 7 (17/01403/F) because he owned a property in the general vicinity although not in close proximity.
 

44 ADDENDUM TO THE AGENDA

An addendum was circulated at the meeting to provide an update on matters arising after the agenda was published.

 

RESOLVED to note and to take into consideration the content of the addendum.

 

Notes:

 

1. The Committee agreed to move forward those items for which there was public speaking, being items 5, 7, 10 and 12 on the published agenda.

 

2. These minutes follow the order of the published agenda for consistency.

 

3. The meeting was adjourned at 9.53 pm and resumed at 10 pm.

 

4. In accordance with Committee Procedural Rule 4.10.2, as set out in the Constitution, the Committee

RESOLVED to continue the meeting until 10.45 pm, with any items remaining to be determined then being deferred.

 

5. In consequence, items 9, 11, 13, 14 and 15 on the published agenda stand deferred to a future meeting.
 

45 16/01043/F: REDHILL AERODROME, KINGS MILL LANE, REDHILL

The Committee considered an application for engineering works to resurface, straighten and widen taxiway c/d.

 

A representative from Salfords and Sidlow Parish Council spoke against the application and a representative for the applicant spoke in its favour.

 

Reasons for refusal were proposed and seconded.

 

RESOLVED that planning permission be REFUSED on the following grounds:

 

1. The proposal, by virtue of the extensive additional hard surfacing, constitutes inappropriate development within the Metropolitan Green Belt which would erode the openness of the Green Belt and conflict with the purposes thereof. The considerations in favour of the proposal are insufficient to clearly outweigh the harm to the Green Belt and any other harm, including the detriment to neighbour amenity from additional noise and disturbance due to loss of natural winter respite from flying, so as to constitute very special circumstances. As such, the proposal would be contrary to policy Co1 of the Reigate and Banstead Borough Local Plan 2005, CS1 and CS3 of the Reigate and Banstead Core Strategy and the provisions of the National Planning Policy Framework.

 

2. The proposal fails to provide an agreement to manage the use of the unlicensed runway, with the resultant potential for an uncontrolled increase in the intensity aircraft movements, associated activity and associated levels of general noise and disturbance, which would cause harm to the Green Belt and potential detriment to neighbour amenity. The arguments presented by the applicants in support of the proposal are insufficient to clearly justify such harm and thus the proposal would be contrary to policy Co1 of the Reigate and Banstead Borough Local Plan 2005, CS1 and CS3 of the Reigate and Banstead Core Strategy and the provisions of the National Planning Policy Framework.
 

46 17/00804/F : LAND TO THE REAR OF 92-96 PARTRIDGE MEAD, BANSTEAD

The Committee considered an application for construction of two semi-detached houses and one detached house, along with associated access, parking and landscaping.

 

An accompanied site inspection was undertaken in respect of this application. A request for a further accompanied site inspection to be made in the daytime was rejected upon a vote.

 

In the course of the debate members expressed concerns about the cramped nature of the site and the restrictions on access, in particular for emergency service vehicles. They also had concerns that the site would be car-dominated.

 

The Committee noted that refuse vehicles would be unable to access the properties, and queried the distance residents would have to wheel their bins and where the collection point would be, as it did not appear to be defined on the plans.

 

Upon the vote, the recommendation to approve the application was rejected, however, in the absence of any formal reasons for refusal having been proposed and seconded, as required by the Committee’s Protocol, it was

RESOLVED that the application be DEFERRED to the next meeting to allow formal reasons of refusal to be drafted for approval.


 

47 17/01403/F: 42 CARLTON ROAD, REDHILL

The Committee considered an application for demolition of the existing property with outbuildings and construction of three new four bedroom detached houses with off street parking and associated works.

 

A member of the public spoke against the application and the applicant’s representative spoke in its favour.

 

RESOLVED that planning permission be GRANTED subject to the following conditions:

 

1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason:
To comply with Section 91(1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

2. The development hereby permitted shall be carried out in accordance with the following approved plans:

Plan Type                   Reference   Version  Date received
Site Layout Plan         805 11A                    16.06.2017
Elevation Plan            805 04                       16.06.2017
Elevation Plan            805 03A                     16.06.2017
Existing Plans            805 02C                     16.06.2017
Other Plan                 805 SW03A                16.06.2017
Other Plan                 805 SW02                  16.06.2017
Other Plan                 805 SW01                  16.06.2017
Location Plan            805 01            B          11.08.2017
Site Layout Plan        805 12           B           11.08.2017
Floor Plan                  805 13           A          11.08.2017
Elevation Plan           805 14           A          11.08.2017
Elevation Plan           805 15           A          11.08.2017
Elevation Plan           805 16           A          11.08.2017

 

Reason:
To define the permission and ensure the development is carried out in accord with the approved plans and in accordance with National Planning Practice Guidance.

 

3. No development shall take place until the developer obtains the Local Planning Authority’s written approval of details of both existing and proposed ground levels and the proposed finished ground floor levels of the buildings. The development shall be carried out in accordance with the approved levels.
Reason:
To ensure the Local Planning Authority are satisfied with the details of the proposal and its relationship with adjoining development and to safeguard the visual amenities of the locality with regard to Reigate and Banstead Borough Local Plan 2005 policy Ho9.

 

4. No development shall take place until written details of the materials to be used in the construction of the external surfaces, including fenestration and roof, have been submitted to and approved in writing by the Local Planning Authority, and on development shall be carried out in accordance with the approved details. In addition the new garage to No. 40 shall be constructed in brick with clay tile roof both to match the existing house.
Reason:
To ensure that a satisfactory external appearance is achieved of the development with regard to Reigate and Banstead Borough Local Plan 2005 policies Ho9 and Ho13.

 

5. No development shall commence including demolition and or any groundworks preparation until a detailed, scaled finalised Tree Protection Plan (TPP) and the related finalised Arboricultural Method Statement (AMS) is submitted to and approved in writing by the Local Planning Authority (LPA). These shall include details of the specification and location of exclusion fencing, ground protection and any construction activity that may take place within the Root Protection Areas of trees (RPA) shown to scale on the TPP, including the installation of service routings. The AMS shall also include a pre-start meeting, supervisory regime for their implementation & monitoring with an agreed reporting process to the LPA. All works shall be carried out in strict accordance with these details when approved.
Reason:
To ensure good arboricultural practice in the interests of the maintenance of the character and appearance of the area and to comply with British Standard 5837:2012 ‘Trees in Relation to Design, demolition and Construction – Recommendations’ and policies Pc4 and Ho9 of the Reigate and Banstead Borough Local Plan
Informative:
The use of a suitably qualified arboricultural consultant is essential to provide acceptable submissions in respect of the arboricultural tree condition above. All works shall comply with the recommendations and guidelines contained within British Standard 5837

 

6. No development shall commence on site until a scheme for the landscaping of the site including the retention of existing landscape features has been submitted to and approved in writing by the LPA. Landscaping schemes shall include details of hard and soft landscaping, planting plans, written specifications (including cultivation and other operations associated with tree, shrub, and hedge or grass establishment), schedules of plants, noting species, plant sizes and proposed numbers/densities and an implementation programme.
All hard and soft landscaping work shall be completed in full accordance with the approved scheme, prior to occupation or in accordance with a programme agreed in writing with the local planning authority.
All new tree planting shall be positioned in accordance with guidelines and advice contained in the current British Standard 5837. Trees in relation to construction.
Any trees shrubs or plants planted in accordance with this condition which are removed, die or become damaged or become diseased within five years of planting shall be replaced within the next planting season by trees, shrubs of the same size and species.
Reason:
To ensure good arboricultural and landscape practice in the interests of the maintenance of the character and appearance of the area and to comply with policies Pc4, Ho9 of the Reigate and Banstead Borough Local Plan 2005 and the recommendations within British Standard 5837.
Informative:
The use of a landscape/arboricultural consultant is considered essential to provide acceptable submissions in respect of the above relevant condition. The planting of trees and shrubs shall be in keeping with the character and appearance of the locality. There is an opportunity to incorporate structural landscape trees into the scheme to provide for future amenity and long term continued structural tree cover in this area. It is expected that the replacement structural landscape trees will be of Advanced Nursery Stock sizes with initial planting heights of not less than 4.5m with girth measurements at 1m above ground level in excess of 16/18cm.

 

7. No development shall commence until a Construction Transport Management Plan, to include details of:
(a) parking for vehicles of site personnel, operatives and visitors
(b) loading and unloading of plant and materials
(c) storage of plant and materials
(d) measures to prevent the deposit of materials on the highway
has been submitted to and approved in writing by the Local Planning Authority. Only the approved details shall be implemented during the construction of the development.
Reason:
The above conditions are required in order that the development should not prejudice highway safety nor cause inconvenience to other highway users to satisfy policies Mo5 and Mo7 of the Reigate and Banstead Borough Local Plan 2005 and the objectives of the NPPF 2012.

 

8. The development hereby approved shall not be first occupied unless and until the proposed vehicular access to Carlton Road has been constructed and provided with visibility zones in accordance with the approved plans and thereafter the visibility zones shall be kept permanently clear of any obstruction over 0.6m high.
Reason:
The above conditions are required in order that the development should not prejudice highway safety nor cause inconvenience to other highway users to satisfy policies Mo5 and Mo7 of the Reigate and Banstead Borough Local Plan 2005 and the objectives of the NPPF 2012.

 

9. The development hereby approved shall not be first occupied unless and until the existing access from the site to Carlton Road has been permanently closed and any kerbs, verge, footway, fully reinstated.
Reason:
The above conditions are required in order that the development should not prejudice highway safety nor cause inconvenience to other highway users to satisfy policies Mo5 and Mo7 of the Reigate and Banstead Borough Local Plan 2005 and the objectives of the NPPF 2012.

10. The development hereby approved shall not be first occupied unless and until space has been laid out within the site in accordance with the approved plans for vehicles to be parked and for vehicles to turn so that they may enter and leave the site in forward gear. Thereafter the parking /turning areas shall be retained and maintained for their designated purposes.
Reason:
The above conditions are required in order that the development should not prejudice highway safety nor cause inconvenience to other highway users to satisfy policies Mo5 and Mo7 of the Reigate and Banstead Borough Local Plan 2005 and the objectives of the NPPF 2012.

11. The development shall not be occupied until a plan indicating the positions, design, materials and type of boundary treatment to be erected has been submitted to and approved in writing by the Local Planning Authority. The boundary treatment shall be completed before the occupation of the development hereby permitted. Boundary treatment to no 46 Carlton Road shall be 2 metres in height and once constructed the 2 metre fence must be maintained/retained for the life of the development.
Reason:
To preserve the visual amenity of the area and protect neighbouring residential amenities with regard to the Reigate and Banstead Borough Local Plan 2005 policies Ho9 and Pc4.

 

12. Prior to the commencement of development a (detailed) surface water drainage strategy should be submitted to and approved in writing by the Local Planning Authority. This shall include details of:


  1. Assessment of the existing flow path, ditch and culvert. This is to be retained/realigned so there is no increase of flood risk.
  2. The existing ditch/culvert will require full clean out and maintenance prior to construction. It should also be shown that there are not blockages downstream that may increase flood risk on site.
  3. Potential surface water risk from exceedance flows should be accommodated in the drainage design. Additional SuDS devices will need to be provided to manage any potential overland flows without water exiting the site or causing risk to the dwellings.
  4. Boreholes in the area indicates clay over sand and so careful consideration (and supporting BRE soakage testing) of infiltration methods must be applied to the drainage scheme.
  5. The clay layer may indicate a perched groundwater table and so it is recommended that ground investigations are undertaken.


Development shall thereafter be carried out in accordance with the approved details and retained thereafter.
 

Reason:
To ensure satisfactory drainage is provided to prevent the exacerbation of flood risk with regards Policy Ut4 of the Reigate and Banstead Borough Local Plan 2005.

 

13. The first floor windows in the south-east side elevations of the development hereby permitted shall be glazed with obscured glass which shall be fixed shut, apart from a top hung opening fanlight whose cill height shall not be less than 1.7 metres above internal floor level, and shall be maintained as such at all times.
Reason:
To ensure that the development does not affect the amenity of the neighbouring property by overlooking with regard to Reigate and Banstead Borough Local Plan 2005 policy Ho9.

 

14. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015, (or any Order revoking and re-enacting that Order with or without modification), no first floor windows, dormer windows or rooflights other than those expressly authorised by this permission shall be constructed.
Reason:
To ensure that the development does not affect the amenity of the neighbouring property by overlooking and to protect the visual amenities of the area in accordance with Reigate and Banstead Borough Local Plan 2005 policy Ho9.

 

15. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions permitted by Classes A B and C of Part 1 of the Second Schedule of the 2015 Order shall be constructed.
Reason:
To control any subsequent enlargements in the interests of the visual and residential amenities of the locality with regard to Reigate and Banstead Borough Local Plan 2005 policies Ho9, Ho13, and Ho16

 

 

INFORMATIVES


1. Your attention is drawn to the safety benefits of installing sprinkler systems as an integral part of new development. Further information is available at www.firesprinklers.info.

 

2. The applicant is encouraged to provide renewable technology within the development hereby permitted in order to reduce greenhouse gas emissions.

 

3. The applicant is advised that prior to the initial occupation of any individual dwelling hereby permitted, a 140 litre wheeled bin conforming to British Standard BSEN840 and a 60 litre recycling box should be provided for the exclusive use of the occupants of that dwelling. Prior to the initial occupation of any communal dwellings or flats, wheeled refuse bins conforming to British Standard BSEN840, separate recycling bins for paper/card and mixed cans, and storage facilities for the bins should be installed by the developer prior to the initial occupation of any dwelling hereby permitted. Further details on the required number and specification of wheeled bins and recycling boxes is available from the Council’s Neighbourhood Services on 01737 276501 or 01737 276097, or on the Council’s website at www.reigate-banstead.gov.uk. Bins and boxes meeting the specification may be purchased from any appropriate source, including the Council’s Neighbourhood Services Unit on 01737 276775.

 

4. You are advised that the Council will expect the following measures to be taken during any building operations to control noise, pollution and parking:
  (a) Work that is audible beyond the site boundary should only be carried out between 08:00hrs to 18:00hrs   Monday to Friday, 08:00hrs to 13:00hrs Saturday and not at all on Sundays or any Public and/or Bank Holidays;
  (b) The quietest available items of plant and machinery should be used on site. Where permanently sited equipment such as generators are necessary, they should be enclosed to reduce noise levels;
  (c) Deliveries should only be received within the hours detailed in (a) above;
  (d) Adequate steps should be taken to prevent dust-causing nuisance beyond the site boundary. Such uses include the use of hoses to damp down stockpiles of materials, which are likely to generate airborne dust, to damp down during stone/slab cutting; and the use of bowsers and wheel washes;
  (e) There should be no burning on site;
  (f) Only minimal security lighting should be used outside the hours stated above; and
  (g) Building materials and machinery should not be stored on the highway and contractors’ vehicles should be parked with care so as not to cause an obstruction or block visibility on the highway.
 

Further details of these noise and pollution measures can be obtained from the Council’s Environmental Health Services Unit.
 

In order to meet these requirements and to promote good neighbourliness, the Council recommends that this site is registered with the Considerate Constructors Scheme - www.ccscheme.org.uk/index.php/site-registration.

 

5. The applicant is advised that the essential requirements for an acceptable communication plan forming part of a Method of Construction Statement are viewed as: (i) how those likely to be affected by the site's activities are identified and how they will be informed about the project, site activities and programme; (ii) how neighbours will be notified prior to any noisy/disruptive work or of any significant changes to site activity that may affect them; (iii) the arrangements that will be in place to ensure a reasonable telephone response during working hours; (iv) the name and contact details of the site manager who will be able to deal with complaints; and (v) how those who are interested in or affected will be routinely advised regarding the progress of the work. Registration and operation of the site to the standards set by the Considerate Constructors Scheme (http://www.ccscheme.org.uk/) would help fulfil these requirements.

 

6. The permission hereby granted shall not be construed as authority to carry out works on the highway. The applicant is advised that prior approval must be obtained from the Highway Authority before any works are carried out on any footway, footpath, carriageway, or verge to form a vehicle crossover or to install dropped kerbs. Please see:
www.surreycc.gov.uk/roads-and-transport/road-permits-and-licences/vehicle-crossovers-or-dropped-kerbs.

 

7. When an access is to be closed as a condition of planning permission an agreement with, or licence issued by, the Highway Authority Local Highways Service will require that the redundant dropped kerb be raised and any verge or footway crossing be reinstated to conform with the existing adjoining surfaces at the developers expense.

 

8. The developer is reminded that it is an offence to allow materials to be carried from the site and deposited on or damage the highway from uncleaned wheels or badly loaded vehicles. The Highway Authority will seek, wherever possible, to recover any expenses incurred in clearing, cleaning or repairing highway surfaces and prosecutes persistent offenders. (Highways Act 1980 Sections 131, 148, 149).

 

9. The developer is advised that as part of the detailed design of the highway works required by the above conditions, the County Highway Authority may require necessary accommodation works to street lights, road signs, road markings, highway drainage, surface covers, street trees, highway verges, highway surfaces, surface edge restraints and any other street furniture / equipment.


 

48 THE ANGEL PUBLIC HOUSE, 1A WOODHATCH ROAD, REIGATE

The Committee considered the following applications. It was noted that an accompanied site inspection was made in respect of these applications.

 

(a) 16/02619/F : Conversion of the vacant public house to a 5 bed dwelling and the erection of a new three bedroom dwelling following demolition of existing outbuildings.

 

The Committee asked for a condition to prevent the new dwelling from being occupied until the repair works had been completed, and it is noted that this is covered within condition 3(n).

 

RESOLVED that planning permission be GRANTED subject to the following conditions:

 

1. The development hereby permitted shall be carried out in accordance with the following approved plans:

Plan Type          Reference   Version   Date Received
Combined Plan  JW595-100       B       01.08.2017
Elevation Plan    JW595-101       B       01.08.2017
Section Plan       JW595-102       B       01.08.2017
Elevation Plan    JW595-103       K       01.08.2017
Elevation Plan    JW595-104       K       01.08.2017
Floor Plan           JW595-105       B       01.08.2017
Floor Plan           JW595-106       C       01.08.2017
Proposed Plans  JW595-107       C       01.08.2017
 

Reason:
To define the permission and ensure the development is carried out in accord with the approved plans and in accordance with National Planning Practice Guidance.

 

2. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason:
To comply with Section 91(1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

3. Notwithstanding the drawings, the proposed external finishing materials and details shall be carried out using the external facing materials and details specified below and there shall be no variation without the prior approval in writing of the Local Planning Authority;
 

a) All tiles to the new detached dwelling shall be of handmade sandfaced plain clay tiles with hogsback ridge tiles.
b) All tiles to the listed building shall be handmade sandfaced peg tiles with hogsback ridge tiles and all salvageable existing peg tiles shall be reused.
c) The front (east) elevation shall be tile hung in handmade sandfaced peg tiles of a lighter colour than the main roof, with no Winchester cut, before the listed building is occupied.
d) All external joinery shall be of painted timber.
e) All casement windows shall be of painted timber with casements in each opening to ensure equal sightlines and glazing bars of traditional profile, painted white on the listed building and black on the new dwelling.
f) All fascias on the new dwelling shall be no more than two bricks depth.
g) All rainwater goods shall be of painted cast metal.
h) Any rooflights shall be black painted metal conservation rooflight with a single vertical glazing bar.
i) All cladding to the new dwelling shall be of black stained featheredge timber.
j) The boundary walls shall be of Flemish bond brick in handmade made red stocks of variable colour, with saddleback brick coping to match. The make and colour of the brick which shall be submitted to and approved in writing by the LPA before the walls are constructed.
k) all existing two panel doors shall be salvaged and reused in the listed building and all new internal doors shall be two panelled painted timber doors to match.
l) All existing exposed beams and beamed ceilings shall be retained exposed in the listed building and no abrasive cleaning is permitted.
m) A specification for the repair of the external timber frame shall be prepared by a timber frame specialist and shall be submitted to and approved in writing by the LPA before the external timber frame is repaired. The south side corner post of the central front (east) bay shall be repaired and scarfed in oak post with resin bonded anchors and lead shoe. (Temporary, urgent or emergency repairs may be carried out before the discharge of this condition).
n) No part of the approved scheme, including the new dwellinghouse, shall be occupied until the building repair work has been completed in accordance with a specification agreed with the Local Planning Authority.
o) The stone wall on the west boundary shall be repaired before the any part of the scheme is occupied, with any shortfall in stone to be repaired to existing detail in Wealden sandstone rubble with all pointing to be brushed lime putty mortar set back to the arises.
p) All fencing shall be of vertical close boarded timber of feather edge planks, with timber posts and gravel boards and vertically close boarded gates.
q) All parking areas, drives and hardstanding’s shall be of fixed gravel.
r) All footpaths or patios shall be of fixed gravel or natural stone flagstones.
s) All plants, shrubs and hedges shall be of the following species; privet, holly, yew, box, laurel or hawthorn, to follow the planting mix of the historic garden designation on the north of the site.
t) The plaster from the ground and first floor inglenook stack and chimney breasts shall be hand removed without power tools. Following removal of the plaster, details of the restoration of the inglenooks and fireplaces, including opening up of any surviving inglenooks, shall be submitted to and approved in writing by the local planning authority, and completed in accordance with these approved details before the building is occupied.
u) The public house hanging sign on the elevation of the listed building fronting Cockshot Hill shall be restored and retained on the building before it is occupied.
Reason:
To ensure that the historic and architectural character of the Grade II listed building is maintained in accordance with paragraph 128 of the National Planning Policy Framework 2012, Policy CS4 of the Reigate and Banstead Core Strategy and Policy Pc9 of the Reigate and Banstead Borough Local Plan 2005.

 

4. The development hereby approved shall not be first occupied unless and until space has been laid out within the site in accordance with the approved plans for vehicles to be parked and for vehicles to turn so that they may enter and leave the site in a forward gear. Thereafter the parking and turning areas shall be retained and maintained for their designated purposes.
Reason:
In order to safeguard residential amenities and to ensure that the development should not prejudice highway safety, nor cause inconvenience to other highway users with regard to the requirements of the National Planning Policy Framework and Reigate and Banstead Borough Local Plan 2005 policies Mo5 and Mo7.

 

5. No development shall commence until a Construction Transport Management Plan, to include details of:
  a. Parking for vehicles of site personnel, operatives and visitors;
  b. Loading and unloading of plant and materials;
  c. Storage of plant and materials;
  d. Measures to prevent the deposit of materials on the highway;
has been submitted to and approved in writing by the Local Planning Authority. Only the approved details shall be implemented during the construction of the development.
Reason:
To ensure there would be no disruption to the highway network and protect neighbouring residential amenities with regard to the Reigate and Banstead Borough Local Plan 2005 policies Mo5 and Ho9.

 

6. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions permitted by Classes A to E of Part 1 of the Second Schedule of the 2015 Order shall be constructed.
Reason:
To control any subsequent enlargements in the interests of the visual and residential amenities of the locality with regard to Reigate and Banstead Borough Local Plan 2005 policies Ho9, Ho13, and Ho16.

 

7. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, (or any Order revoking and re-enacting that Order with or without modification), no first floor windows, dormer windows or rooflights other than those expressly authorised by this permission shall be constructed.
Reason:
To ensure that the development does not affect the amenity of the neighbouring property by overlooking and to protect the visual amenities of the area in accordance with Reigate and Banstead Borough Local Plan 2005 policy Ho9.

 

8. The development shall not be occupied until a plan indicating the positions, design, mater

ials and type of boundary treatment to be erected has been submitted to and approved in writing by the Local Planning Authority. The boundary treatment shall be completed before the occupation of the development hereby permitted.
Reason:
To preserve the visual amenity of the area and protect neighbouring residential amenities with regard to the Reigate and Banstead Borough Local Plan 2005 policies Ho9 and Pc4.

 

9. No development shall commence on site until a scheme for the landscaping of the site including the retention of existing landscape features has been submitted to and approved in writing by the LPA. Landscaping schemes shall include details of hard and soft landscaping, including any tree removal/retention, planting plans, written specifications (including cultivation and other operations associated with tree, shrub, and hedge or grass establishment), schedules of plants, noting species, plant sizes and proposed numbers/densities and an implementation and management programme.
All hard and soft landscaping work shall be completed in full accordance with the approved scheme, prior to occupation or within the first planting season following completion of the development hereby approved or in accordance with a programme agreed in writing with the local planning authority.

Any trees shrubs or plants planted in accordance with this condition which are removed, die or become damaged or become diseased within five years of planting shall be replaced within the next planting season by trees, shrubs of the same size and species.
Reason
To ensure good arboricultural and landscape practice in the interests of the maintenance of the character and appearance of the area and to comply with policies Pc4 and Ho9 of the Reigate and Banstead Borough Local Plan 2005.

 

INFORMATIVES
1. Your attention is drawn to the safety benefits of installing sprinkler systems as an integral part of new development. Further information is available at www.firesprinklers.info.

 

2. The applicant is encouraged to provide renewable technology within the development hereby permitted in order to reduce greenhouse gas emissions.

 

3. The applicant is advised that prior to the initial occupation of any individual dwelling hereby permitted, a 140 litre wheeled bin conforming to British Standard BSEN840 and a 60 litre recycling box should be provided for the exclusive use of the occupants of that dwelling. Prior to the initial occupation of any communal dwellings or flats, wheeled refuse bins conforming to British Standard BSEN840, separate recycling bins for paper/card and mixed cans, and storage facilities for the bins should be installed by the developer prior to the initial occupation of any dwelling hereby permitted. Further details on the required number and specification of wheeled bins and recycling boxes is available from the Council’s Neighbourhood Services on 01737 276501 or 01737 276097, or on the Council’s website at www.reigate-banstead.gov.uk. Bins and boxes meeting the specification may be purchased from any appropriate source, including the Council’s Neighbourhood Services Unit on 01737 276775.

 

4. You are advised that the Council will expect the following measures to be taken during any building operations to control noise, pollution and parking:


(a) Work that is audible beyond the site boundary should only be carried out between 08:00hrs to 18:00hrs Monday to Friday, 08:00hrs to 13:00hrs Saturday and not at all on Sundays or any Public and/or Bank Holidays;
(b) The quietest available items of plant and machinery should be used on site. Where permanently sited equipment such as generators are necessary, they should be enclosed to reduce noise levels;
(c) Deliveries should only be received within the hours detailed in (a) above;
(d) Adequate steps should be taken to prevent dust-causing nuisance beyond the site boundary. Such uses include the use of hoses to damp down stockpiles of materials, which are likely to generate airborne dust, to damp down during stone/slab cutting; and the use of bowsers and wheel washes;
(e) There should be no burning on site;
(f) Only minimal security lighting should be used outside the hours stated above; and
(g) Building materials and machinery should not be stored on the highway and contractors’ vehicles should be parked with care so as not to cause an obstruction or block visibility on the highway.
 

Further details of these noise and pollution measures can be obtained from the Council’s Environmental Health Services Unit.
 

In order to meet these requirements and to promote good neighbourliness, the Council recommends that this site is registered with the Considerate Constructors Scheme - www.ccscheme.org.uk/index.php/site-registration.

 

5. The use of a suitably qualified arboricultural consultant is essential to provide acceptable supervision and monitoring in respect of the arboricultural issues in respect of the above condition. All works shall comply with the recommendations and guidelines contained within British Standard 5837.

 

6. The developer is advised that it is an offence to allow materials to be carried from the site and deposited on or damage the highway from uncleaned wheels or badly loaded vehicles. The Highway Authority will seek, wherever possible, to recover any expenses incurred in clearing, cleaning or repairing highway surfaces and prosecutes persistent offenders. (Highways Act 1980 Sections 131, 148, 149).

 

 

(b) 16/02619/F :


Listing Building Consent for conversion of the vacant public house to a 5 bed dwelling and the erection of a new three bedroom dwelling following demolition of existing outbuildings

 

RESOLVED that planning permission be GRANTED subject to the following conditions:

 

1. The development hereby permitted shall be carried out in accordance with the following approved plans:

Plan Type           Reference   Version   Date Received
Combined Plan  JW595-100   B           01.08.2017
Elevation Plan    JW595-101   B           01.08.2017
Section Plan       JW595-102   B          01.08.2017
Elevation Plan     JW595-103  K           01.08.2017
Elevation Plan     JW595-104  K           01.08.2017
Floor Plan           JW595-105   B           01.08.2017
Floor Plan           JW595-106  C           01.08.2017
Proposed Plans  JW595-107  C          01.08.2017


Reason:
To define the permission and ensure the development is carried out in accord with the approved plans and in accordance with National Planning Practice Guidance.

 

2. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason:
To comply with Section 91(1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

3. Notwithstanding the drawings, the proposed external finishing materials and details shall be carried out using the external facing materials and details specified below and there shall be no variation without the prior approval in writing of the Local Planning Authority;


a) All tiles to the new detached dwelling shall be of handmade sandfaced plain clay tiles with hogsback ridge tiles.
b) All tiles to the listed building shall be handmade sandfaced peg tiles with hogsback ridge tiles and all salvageable existing peg tiles shall be reused.
c) The front (east) elevation shall be tile hung in handmade sandfaced peg tiles of a lighter colour than the main roof, with no Winchester cut, before the listed building is occupied.
d) All external joinery shall be of painted timber.
e) All casement windows shall be of painted timber with casements in each opening to ensure equal sightlines and glazing bars of traditional profile, painted white on the listed building and black on the new dwelling.
f) All fascias on the new dwelling shall be no more than two bricks depth.
g) All rainwater goods shall be of painted cast metal.
h) Any rooflights shall be black painted metal conservation rooflight with a single vertical glazing bar.
i) All cladding to the new dwelling shall be of black stained featheredge timber.
j) The boundary walls shall be of Flemish bond brick in handmade made red stocks of variable colour, with saddleback brick coping to match. The make and colour of the brick which shall be submitted to and approved in writing by the LPA before the walls are constructed.
k) All existing two panel doors shall be salvaged and reused in the listed building and all new internal doors shall be two panelled painted timber doors to match.
l) All existing exposed beams and beamed ceilings shall be retained exposed in the listed building and no abrasive cleaning is permitted.
m) A specification for the repair of the external timber frame shall be prepared by a timber frame specialist and shall be submitted to and approved in writing by the LPA before the external timber frame is repaired. The south side corner post of the central front (east) bay shall be repaired and scarfed in oak post with resin bonded anchors and lead shoe. (Temporary, urgent or emergency repairs may be carried out before the discharge of this condition).
n) No part of the approved scheme, including the new dwellinghouse, shall be occupied until the building is repair work has been completed in accordance with a specification agreed with the Local Planning Authority.
o) The stone wall on the west boundary shall be repaired before the any part of the scheme is occupied, with any shortfall in stone to be repaired to existing detail in Wealden sandstone rubble with all pointing to be brushed lime putty mortar set back to the arises.
p) All fencing shall be of vertical close boarded timber of feather edge planks, with timber posts and gravel boards and vertically close boarded gates.
q) All parking areas, drives and hardstandings shall be of fixed gravel.
r) All footpaths or patios shall be of fixed gravel or natural stone flagstones.
s) All plants, shrubs and hedges shall be of the following species; privet, holly, yew, box, laurel or hawthorn, to follow the planting mix of the historic garden designation on the north of the site.
t) The plaster from the ground and first floor inglenook stack and chimney breasts shall be hand removed without power tools. Following removal of the plaster, details of the restoration of the inglenooks and fireplaces, including opening up of any surviving inglenooks, shall be submitted to and approved in writing by the local planning authority, and completed in accordance with these approved details before the building is occupied.
u) The public house hanging sign on the elevation of the listed building fronting Cockshot Hill shall be restored and retained on the building before it is occupied.
Reason:
To ensure that the historic and architectural character of the Grade II listed building is maintained in accordance with paragraph 128 of the National Planning Policy Framework 2012, Policy CS4 of the Reigate and Banstead Core Strategy and Policy Pc9 of the Reigate and Banstead Borough Local Plan 2005.
 

49 17/00714/F: MEROK PARK NURSING HOME, PARK ROAD, BANSTEAD

Application deferred.

50 17/01069/F: 38 RINGWOOD AVENUE, REDHILL

The Committee considered an application for demolition of the existing detached house and construction of two semi-detached 3 bedroom houses together with associated parking and amenity areas.

 

An unaccompanied site inspection was requested in respect of this application.

 

A member of the public spoke against the application and the applicant spoke in its favour.

 

Reasons for refusal were proposed and seconded.

 

RESOLVED that planning permission be REFUSED on the following grounds:

 

1. The proposed development would, by reason of the height and depth of the proposed building and its close proximity to the side boundary with 40 Ringwood, result in a dominant and overbearing impact on the immediate garden area that that would harm the amenities of this neighbouring property, contrary to policies Ho9 and Ho13 of the Reigate and Banstead Borough Local Plan 2005 and the provisions of the National Planning Policy Framework in relation to ‘Requiring Good Design’.


 

51 17/01639/F: PARK VIEW, 105 BELL STREET, REIGATE

Application deferred

52 17/01708/F: 2 HERNBROOK, CHEQUERS LANE, WALTON

The Committee considered an application for demolition of the existing sub standard single storey dwelling and the erection of a two storey replacement dwelling, together with retrospective approval for new dropped kerb crossover access.

 

It was noted that an accompanied site inspection was held in June 2017, in respect of a previous application, which many members had attended.

 

A representative of Tadworth and Walton Residents Association and a member of the public spoke against the application. The applicant’s representative spoke in its favour.

 

RESOLVED that planning permission be REFUSED on the following grounds:

 

1. The proposed replacement dwelling, by virtue of its height, scale, bulk, depth and proximity to the side boundaries of Hernbrook Cottage and 1 Rose Cottages, would have a dominant and overbearing presence upon these properties, when viewed from their rear windows and private rear gardens. This would be harmful to their residential amenities and be contrary to Policies Ho9 and Ho13 of the Reigate and Banstead Borough Local Plan 2005.

 

2. The proposed replacement dwelling by virtue of its two first floor front windows serving 'Bedrooms 2 and 3' would result in an unacceptable level of overlooking to the private rear garden areas and rear windows of Hernbrook Cottage and 1 Rose Cottages. This would result in a harmful loss of privacy to these properties, detrimental to their residential amenities and contrary to Policies Ho9 and Ho13 of the Reigate and Banstead Borough Local Plan 2005.


 

53 17/01588/RET: NUMBER 12 RESTAURANT, 12 WATERHOUSE LANE, KINGSWOOD

Application deferred.

54 17/01916/HHOLD: 39 BLETCHINGLEY ROAD, MERSTHAM

Application deferred.
 

55 17/01920/HOLD: 115 BLETCHINGLEY ROAD, MERSTHAM

Application deferred.
 

56 ANY OTHER URGENT BUSINESS

None.

10.44pm