17/02876/F: Redhill Youth Association Hall, Marketfield Road, Redhill

Demolition of existing building to provide 50 residential units (including affordable housing) and a community hall, together with bicycle spaces, plant, internal refuse storage, roof-garden and associated landscaping.

Minutes:

The Committee considered an application for demolition of the existing building to provide 50 residential units (including affordable housing) and a community hall, together with bicycle spaces, plant, internal refuse storage, roof-garden and associated landscaping.

Members asked for an informative to be added to the permission, in respect of the Construction Transport Management Plan, encouraging the developer to liaise closely with other developers in the area to ensure that traffic management across all sites was designed to cause the least disturbance possible.

The Committee also agreed that an informative should be added, encouraging Network Rail to take the opportunity to upgrade the subway and clear the neighbouring pathways which would enhance the overall landscaping.

RESOLVED that planning permission be GRANTED subject to:

(a)  the completion of all documentation required to create a planning obligation under Section 106 of the Town and Country Planning Act 1990 (as amended) to secure:

(i)        seven units of affordable housing as shared equity tenure;

(ii)       the provision of a new community facility to an agreed shell & core specification and transfer of a long-leasehold interest in the facility to the Borough Council at a peppercorn and otherwise reasonable terms;

(iii)      a contribution of £200,000 towards the internal fit-out of the community facility;

(iv)      car club membership for all residents for a period of three years;

(v)       a contribution of £4,600 towards the monitoring of a Travel Plan for the development; and

(vi)      the Council’s legal costs in preparing the agreement.

In the event that a satisfactorily completed obligation is not received by 31 June 2018 or such longer period as may be agreed, the Head of Places and Planning be authorised to refuse permission for the following reason:

The proposal fails to make adequate provision for: affordable housing, the satisfactory replacement of the existing community use and measures to promote sustainable travel and is therefore contrary to policies Cf1, Mo4 and Mo7 of the Reigate and Banstead Borough Local Plan 2005 and policies CS12, CS15 and CS17 of the Reigate and Banstead Core Strategy 2014.

(b)       an informative encouraging the developer to liaise with other developers in the area on their Construction Management Plans to mitigate disturbance;

(c)       an informative encouraging the neighbouring landowner to undertake improvements to the subway and pathways; and

(d)       the following conditions:

1.    The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

Reason:

To comply with Section 91(1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

2.    The development hereby permitted shall be carried out in accordance with the following approved plans:

Plan Type

Reference

Version

Date Received

Site Layout Plan

A1-001

1

07.12.2017

Existing Plans

A2-003

0

07.12.2017

Site Layout Plan

A2-002

0

07.12.2017

Location Plan

A2-001

0

07.12.2017

Proposed Plans

A1-104

2

07.12.2017

Elevation Plan

A1-103

2

07.12.2017

Floor Plan

A1-102

1

07.12.2017

Floor Plan

A1-101

1

07.12.2017

Site Layout Plan

UNNUMBERED

 

07.12.2017

Site Layout Plan

UNNUMBERED

 

07.12.2017

Site Layout Plan

UNNUMBERED

 

07.12.2017

 

Reason:

To define the permission and ensure the development is carried out in accord with the approved plans and in accordance with National Planning Practice Guidance.

 

3.    No development shall commence until a Construction Transport Management Plan, to include details of:

(a)  Parking for vehicles of site personnel, operatives and visitors

(b)  Loading and unloading or plant and materials

(c)  Storage of plant and materials

(d)  Programme of works (including measures for traffic management)

(e)  Provision of boundary hoarding behind any visibility zones

(f)   Measures to prevent the deposit of materials on the highway

(g)  Measures to encourage use of non-car modes of transport to the site during construction

has been submitted to and approved in writing by the Local Planning Authority. Only the approved details shall be implemented during the construction of the development.

Reason:

In order that the development should not prejudice highway safety nor cause inconvenience to other highway users to satisfy policies Mo5 and Mo7 of the Reigate and Banstead Borough Local Plan 2005 and the objectives of the NPPF 2012.

 

4.    No development shall commence until details of measures to safeguard the Redhill Brook culvert have been submitted to and approved in writing by the Local Planning Authority. Such measures shall include:

(a)  Confirmation of the exact location, alignment, depth and dimensions of the culvert in the vicinity of the site, including a CCTV condition survey for the culvert length adjacent to the site boundary

(b)  Detailed design drawings and structural calculations for any works within 8 metres of the outer most edge of the culvert to demonstrate that the structural integrity of the culvert will not be undermined due to the proximity of any proposed works

(c)  a construction method statement including timing of works, methods used for all works within 8 metres of the culvert, machinery to be employed on site (including location and storage of plant, materials and fuel, access routes) and details of site supervision (including supervision of works within 8 metres of the culvert)

Only the approved details shall be implemented during the construction of the development.

Reason:

In order that the development does not increase the risk of flooding by compromising the structural integrity of the Redhill Brook or its ability to convey water in accordance with policy Ut4 of the Reigate and Banstead Borough Local Plan 2005 and Policy CS10 of the Reigate and Banstead Core Strategy.

 

5.    No development shall commence on site until a scheme for the landscaping of the site, including the new public realm area between Marketfield Way and the subway, has been submitted and approved in writing by the Local Planning Authority. The landscaping scheme shall details of:

a)    hard landscaping including materials and street furniture,

b)    planting plans including schedules of plants noting species, plant sizes and proposed numbers/densities,

c)    specifications for tree, shrub, and hedge or grass planting and establishment, including details of planting pits/trenches, soils, guying, aeration, drainage and irrigation

d)    an implementation programme

All hard and soft landscaping work, including the new public realm area, shall be completed in full accordance with the approved scheme, prior to occupation or use of the approved development or in accordance with a programme agreed in writing with the Local Planning Authority.

All new tree planting shall be positioned in accordance with guidelines and advice contained in the current British Standard 5837: Trees in relation to construction.

Any trees shrubs or plants planted in accordance with this condition which are removed, die or become damaged or become diseased within five years of planting shall be replaced within the next planting season by trees, and shrubs of the same size and species.

Reason:

To ensure good arboricultural and landscape practice in the interests of the maintenance of the character and appearance of the area and to comply with policies Pc4 and Ho9 of the Reigate and Banstead Borough Local Plan 2005.

 

6.    No development shall commence until details of the proposed finished floor levels and flood mitigation works as detailed in the approved Flood Risk Assessment (FRA) revision 6 produced by AECOM dated 19 January 2018 have been submitted to and approved in writing by the Local Planning Authority. These details shall include:

(a)  The finished floor level of the residential section of the ground floor unit shall have a finished floor level of no less 77.5m AOD which is set 600mm above the 1% annual probability event flood level

(b)  Safe access shall be provided to the east side of the building, whilst egress from the ground level residential unit shall be achieved by a raised entrance to the south of the building out of the floodplain

(c)  The plant section of the building which has proposed ground levels below the 1% annual probability event shall include flood resistant construction required to protect vulnerable equipment

(d)  Flood plain compensation shall be provided in the void underneath the residential ground floor unit

Reason:

To reduce the risk of flooding and ensure the development will be safe over its lifetime in accordance with policy Ut4 of the Reigate and Banstead Borough Local Plan 2005 and Policy CS10 of the Reigate and Banstead Core Strategy.

 

7.    No development shall commence until the detailed design of the surface water drainage scheme has been submitted to an approved in writing by the Local Planning Authority. Such details should include:

a)    A design that satisfies the SuDS Hierarchy and is compliant with the national non-statutory Technical Standards for SuDS, NPPF and Ministerial Statement on SuDS

b)    Evidence that the proposed solution will effectively manage the 1 in 30 and 1 in 100 (+40% CC allowance) for climate change storm events, during all stages of the development (pre, post and during), associated discharge rates and storage volumes shall be provided using a Greenfield discharge rate of 2 litres per second

c)    Detailed drawings to include: a finalised drainage layout detailing the location of SuDS elements, pipe diameters, levels, details of how SuDS elements will be protected from root damage and long and cross sections of each SuDS element including details of any flow restrictions and how they will be protected from blockage

d)    Details of the remedial works required to utilise the existing surface water outfall

e)    Details of management and maintenance regimes and responsibilities

f)     A plan showing exceedance flows and how property on and off site will be protected

Reason:

To ensure that the development is served by an adequate and approved means of drainage which would not increase flood risk on or off site and is suitably maintained throughout its lifetime to comply with Policy Ut4 of the Reigate and Banstead Borough Local Plan 2005, Policy CS10 of the Core Strategy 2014 and the requirements of non-statutory technical standards.

 

8.    No development shall commence until updated contaminated land desktop study and contaminated land site investigations have been undertaken, the results of which shall be submitted to and approved in writing by the Local Planning Authority and should address the following points:

a)    An updated desktop study for the site, including a revised and updated site walkover and identification of any changes to site environs

b)    Updated testing of shallow soils for similar determinants to those tested in the Ground Investigation Report by Geo-Environmental (ref: GE8630C dated September 2012) and taking account of any Asbestos Containing Materials that may have degraded and affected site soils in the intervening period;

c)    A further report on the knotweed status of the site

d)    Ground gas monitoring data from a minimum of 3no. boreholes for a minimum of 6no. visits with regard to the frequency and monitoring periods stipulated in Tables 5.5a and 5.5b of CIRIA C665 “Assessing risks posed by hazardous ground gases to buildings guidance document”.

The above investigations shall be carried out in accordance with a proposal to be submitted to and approved in writing by the Local Planning Authority.

            Reason:

In order that contamination risks on the site are fully assessed on the basis of up to date information and to ensure that any remediation and subsequent development will not cause harm to human health or pollution of controlled waters with regard to Reigate and Banstead Borough Council Local Plan 2005 and the NPPF.

 

9.    Prior to commencement of development or remediation on site and following submission of the updated desktop study and site investigations required in Condition 8, a detailed remediation method statement shall be submitted to and approved in writing by the Local Planning Authority.

The statement shall explain the extent and method(s) by which the site is to be remediated, including any ground gas protection, to ensure that unacceptable risks are not posed to identified receptors. The statement shall also identify the information to be included in any validation report.

Any remediation works shall be completed in strict accordance with the approved method statement and the Local Planning Authority shall be given a minimum of two weeks’ notice before the relevant remediation works commence on site.

Reason:

To ensure that the proposed development and any site investigations and remediation will not cause harm to human health or pollution of controlled waters with regard to Reigate and Banstead Borough Council Local Plan 2005 and the NPPF.

 

10. Any contamination not previously identified by the site investigation but subsequently found to be present at the site shall be reported to the Local Planning Authority as soon as is practicable.

If deemed necessary development shall cease on site until an addendum to the remediation method statement, detailing how the unsuspected contamination is to be dealt with, has been submitted in writing to the Local Planning Authority.  The remediation method statement is subject to the written approval of the Local Planning Authority and any additional requirements that it may specify.

Reason:

To ensure that the proposed development and any site investigations and remediation will not cause harm to human health or pollution of controlled waters with regard to Reigate and Banstead Borough Council Local Plan 2005 and the NPPF.

11. Notwithstanding the approved plans, no development above ground floor slab level of any part of the development hereby approved shall take place until written details of the materials to be used in the construction of the external surfaces, including fenestration, balconies and roof, have been submitted to and approved in writing by the Local Planning Authority, and on development shall be carried out in accordance with the approved details.

            Reason:

To ensure that a satisfactory external appearance is achieved of the development with regard to Reigate and Banstead Borough Local Plan 2005 policies Ho9 and Ho13.

 

12. No development above ground floor slab level of any part of the development hereby approved shall take place until a scheme for the soundproofing of the floors and walls between the proposed Community Use unit and any vertically or horizontally adjoining residential accommodation has been submitted to and approved in writing by the Local Planning Authority.

The measures shall be implemented in strict accordance with the approved details prior to first occupation of the development and shall thereafter be retained as such.

            Reason:

In order to safeguard the residential amenities of adjoining occupiers of the development with regard to Reigate and Banstead Borough Local Plan 2005 policies Ho9 and Ho13.

 

13. The community unit (identified as Community use on approved drawing A1-101 P Rev 1) hereby approved shall be occupied for purposes falling within Use Class D1 and/or as offices falling within Use Class B1(a) provided the latter is carried on only by a charitable, voluntary sector, community sector or similar organisation as may be agreed by the Local Planning Authority.

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification) no change of use shall occur without planning permission obtained from the Local Planning Authority.

            Reason:

To ensure there is adequate control over the use of the unit in order to safeguard the availability of the accommodation for community uses and organisations with regard to Reigate and Banstead Borough Local Plan 2005 policy Cf1.

 

14. The development hereby approved shall be carried out in accordance the approved Noise and Vibration Assessment produced by Sharps Redmore (dated 30 November 2017)

The window systems installed to the residential units shall meet the specifications set out in paragraphs 4.9 and 4.10 (including the corresponding figure on paragraph 4.11) unless an alternative specification is agreed in writing with the Local Planning Authority.

Reason:

To ensure that future occupants would not be exposed to unacceptable levels of noise and in order to achieve an adequate level of residential amenity with regard to policies Ho9 and Ho10 of the Reigate and Banstead Borough Local Plan 2005 and policy CS10 of the Reigate and Banstead Core Strategy.

 

15. The development hereby approved shall be carried out in accordance with the approved Air Quality Assessment produced by AECOM dated 26 November 2017, with particular regard to the use of a low NOx emission (<40 mg/kWhr) boiler/heating plant as specified in Section 4 and the recommendations in Appendix C with regard to Construction Phase Mitigation.

Reason:

To ensure that the development would not give rise to unacceptable impacts on air quality or put future occupants at unacceptable risk of poor air quality with regard to policy Ho9 of the Reigate and Banstead Borough Local Plan 2005 and policy CS10 of the Reigate and Banstead Core Strategy.

 

16. The development hereby approved shall be carried out in accordance with the Energy and Sustainability Statement by Building Services Design dated December 2017 (revision 03).

Notwithstanding the approved plans, details of the final siting and positioning of the proposed solar photovoltaic panels shall be submitted to an approved in writing by the Local Planning Authority prior to the occupation of the first residential unit. Thereafter, the panels shall be installed and operational prior to the occupation of the first residential units.

Reason:

In order to promote renewable energy and to ensure that the development would minimise carbon emissions with regard to Policy CS10 of the Reigate and Banstead Core Strategy.

 

17. The development hereby permitted shall be carried out in accordance with the approved Ecological Survey Including Bat Emergence Surveys Report by Furesfen dated September 2017.

Reason:

In order to preserve and enhance the wildlife and habitat interest on the site and ensure species present on the site are afforded appropriate protection during construction works with regard to Reigate and Banstead Borough Local Plan 2005 policy Pc2G.

 

18. No plant or machinery, including fume extraction, ventilation and air conditioning, which may be required by reason of granting this permission, shall be installed within or on the building without the prior approval in writing of the Local Planning Authority. Any approved plant or machinery shall be installed and thereafter maintained in accordance with the approved details and any manufacturer’s recommendations.

Reason:

To ensure that a satisfactory external appearance is achieved of the development and to safeguard the amenities of neighbouring occupiers with regard to Reigate and Banstead Borough Local Plan 2005 policies Ho9 and Ho13.

 

19. Notwithstanding the approved plans, the development hereby approved shall not be first occupied until the proposed restricted layby loading bay within Marketfield Way and the associated Traffic Regulation Order have been designed and fully implemented in accordance with a scheme to be submitted to and approved in writing by the Local Planning Authority, with all associated costs met by the developer.

Reason:

In order that the development should not prejudice highway safety nor cause inconvenience to other highway users to satisfy policies Mo5 and Mo7 of the Reigate and Banstead Borough Local Plan 2005 and the objectives of the NPPF 2012.

 

20. The development hereby approved shall not be first occupied until facilities for the secure, accessible storage of a minimum of 50 bicycles has been provided within the site in accordance with the approved plans.

Thereafter, the bicycle storage facility shall be retained and maintained for its designated purpose to the satisfaction of the Local Planning Authority.

Reason:

To ensure that the development would promote sustainable transport choices with regard to Policy CS17 of the Reigate and Banstead Core Strategy 2014 and in recognition of Section 4 “Promoting Sustainable Transport” in the National Planning Policy Framework 2012.

 

21. Notwithstanding the submitted Travel Plan, the development hereby approved shall not be first occupied until a revised final Travel Plan in accordance with the aims and objectives of the National Planning Policy Framework and Surrey County Council’s Travel Plan Guidance has been submitted to and approved in writing by the Local Planning Authority.

The applicant shall then implement the approved Travel Plan upon first occupation and for each subsequent occupation of the development and thereafter maintain and develop the Travel Plan to the satisfaction of the Local Planning Authority.

Reason:

To ensure that the development would promote sustainable transport choices with regard to Policy CS17 of the Reigate and Banstead Core Strategy 2014 and in recognition of Section 4 “Promoting Sustainable Transport” in the National Planning Policy Framework 2012

 

22. The residential units hereby approved shall not be first marketed for sale, rent or other occupation until details of the Travel Packs to be provided to purchases have been submitted to and approved in writing by the Local Planning Authority.

The Travel Packs shall include, as a minimum the following details:

a)    The location of leisure, retail, employment, education and health facilities within a 2km walking distance and a 5km cycling distances of the site

b)    Bus and train facilities within 400 metres walking distance of the site

c)    The nearest car club vehicles and details of the membership to be provided to each household

The approved Travel Packs shall be given to each household and shall be updated appropriately as required.

Reason:

To ensure that the development would promote sustainable transport choices with regard to Policy CS17 of the Reigate and Banstead Core Strategy 2014 and in recognition of Section 4 “Promoting Sustainable Transport” in the National Planning Policy Framework 2012.

 

23. The development hereby approved shall not be first occupied until refuse storage facilities have been provided in accordance with the approved plans. The said facilities shall thereafter be retained exclusively for its designated purpose.

Reason:

To ensure that a satisfactory external appearance is achieved of the development with regard to Reigate and Banstead Borough Local Plan 2005 policies Ho9 and Ho13.

 

24. The development hereby approved shall not be first occupied until details of any external lighting have been submitted to and approved in writing by the Local Planning Authority. The external lighting shall be installed in accordance with the approved details and thereafter retained and maintained as such.

Reason:

To ensure safeguard the visual and residential amenities of adjoining occupiers and the surrounding area with regard to Reigate and Banstead Borough Local Plan 2005 policies Ho9 and Ho13.

 

25. The development hereby approved shall not be first occupied unless and until a remediation validation report detailing evidence of the remediation, the effectiveness of the remediation carried out and the results of post remediation works, in accordance with the approved remediation method statement and any addenda thereto, has been submitted to and approved in writing by the Local Planning Authority.

Should specific ground gas mitigation measures be required to be incorporated into a development the testing and verification of such systems should have regard to CIRIA C735 guidance document entitled ‘Good practice on the testing and verification of protection systems for buildings against hazardous ground gases’ and British Standard BS 8285 Code of practice for the design of protective measures for methane and carbon dioxide ground gases for new buildings

Reason:

To demonstrate remedial works are appropriate and demonstrate the effectiveness of remediation works so that the proposed development will not cause harm to human health or pollution of controlled waters with regard to Reigate and Banstead Borough Council Local Plan 2005 Policy Ho9 and the NPPF.

 

26. The development hereby approved shall not be first occupied unless and until a verification report demonstrating that the sustainable urban drainage system has been constructed as per the agreed scheme has been submitted to and approved in writing by the Local Planning Authority. The validation report should be carried out by a qualified drainage engineer.

Reason:

To ensure that the development is served by an adequate and approved means of drainage which would not increase flood risk on or off site and is suitably maintained throughout its lifetime to comply with Policy Ut4 of the Reigate and Banstead Borough Local Plan 2005, Policy CS10 of the Reigate and Banstead Core Strategy 2014 and the requirements of non-statutory technical standards.

 

INFORMATIVES

1.            Your attention is drawn to the safety benefits of installing sprinkler systems as an integral part of new development. Further information is available at www.firesprinklers.info.

2.            The applicant is advised that prior to the occupation of the development, adequate provision should be made for waste storage and collection.You are advised to contact the Council’s Recycling and Cleansing team to discuss the required number and specification of wheeled bins on rc@reigate-banstead.gov.uk or on the Council’s website at http://www.reigate-banstead.gov.uk/info/20051/commercial_waste.

3.            Your attention is drawn to the benefits of using the Secured by Design award scheme.

4.            You are advised that the Council will expect the following measures to be taken during any building operations to control noise, pollution and parking:

(a)    Work that is audible beyond the site boundary should only be carried out between 08:00hrs to 18:00hrs Monday to Friday, 08:00hrs to 13:00hrs Saturday and not at all on Sundays or any Public and/or Bank Holidays;

(b)   The quietest available items of plant and machinery should be used on site.  Where permanently sited equipment such as generators are necessary, they should be enclosed to reduce noise levels;

(c)   Deliveries should only be received within the hours detailed in (a) above;

(d)   Adequate steps should be taken to prevent dust-causing nuisance beyond the site boundary.  Such uses include the use of hoses to damp down stockpiles of materials, which are likely to generate airborne dust, to damp down during stone/slab cutting; and the use of bowsers and wheel washes;

(e)   There should be no burning on site;

(f)    Only minimal security lighting should be used outside the hours stated above; and

(g)   Building materials and machinery should not be stored on the highway and contractors’ vehicles should be parked with care so as not to cause an obstruction or block visibility on the highway.

Further details of these noise and pollution measures can be obtained from the Council’s Environmental Health Services Unit. In order to meet these requirements and to promote good neighbourliness, the Council recommends that this site is registered with the Considerate Constructors Scheme - www.ccscheme.org.uk/index.php/site-registration.

5.            The permission hereby granted shall not be construed as authority to carry out any works on the highway or any works that may affect a drainage channel/culvert or water course. The applicant is advised that a permit and, potentially, a Section 278 agreement must be obtained from the Highway Authority before any works are carried out on any footway, footpath, carriageway, verge or other land forming part of the highway. All works on the highway will require a permit and an application will need to submitted to the County Council's Street Works Team up to 3 months in advance of the intended start date, depending on the scale of the works proposed and the classification of the road. Please see: www.surreycc.gov.uk/roads-and-transport/road-permits-and-licences/the-traffic-management-permit-scheme. The applicant is also advised that consent may be required under Section 23 of the Land Drainage Act 1991. Please see: www.surreycc.gov.uk/people-and-community/emergency-planning-and-community-safety/flooding-advice

6.            The applicant is advised that the submitted Travel Plan shall be revised to include details of how the car club vehicles are to be marketed to site occupants including details of how those residents would obtain free three years car club membership as specified in paragraph 7.7. The applicant shall include the information that is within paragraphs 3.8 to 3.18 of the submitted Transport Assessment and the information within table 3.4 and figure 3.11 of the submitted Transport Assessment, including details of how the travel packs will be kept up to date.

7.            When a temporary access is approved or an access is to be closed as a condition of planning permission an agreement with, or licence issued by, the Highway Authority Local Highways Service will require that the redundant dropped kerb be raised and any verge or footway crossing be reinstated to conform with the existing adjoining surfaces at the developers expense.

8.            The developer is advised that as part of the detailed design of the highway works required by the above condition(s), the County Highway Authority may require necessary accommodation works to street lights, road signs, road markings, highway drainage, surface covers, street trees, highway verges, highway surfaces, surface edge restraints and any other street furniture/equipment.

9.            The developer is reminded that it is an offence to allow materials to be carried from the site and deposited on or damage the highway from uncleaned wheels or badly loaded vehicles. The Highway Authority will seek, wherever possible, to recover any expenses incurred in clearing, cleaning or repairing highway surfaces and prosecutes persistent offenders. (Highways Act 1980 Sections 131, 148, 149).

10.         The culverted section of the Redhill Brook at this location is an Environment Agency designated Main River. Therefore any permanent or temporary activities within 8 metres of the outer most edge may require a Flood Risk Activity Permit. For further information, please see www.gov.uk/guidance/flood-risk-activities-environmental-permits

11.         If proposed site works affect an Ordinary Watercourse, Surrey County Council as the Lead Local Flood Authority should be contacted to obtain prior written consent.

12.         The developer is reminded of the need to comply with Network Rail requirements and standards for the safe operation of the railway and the protection of Network Rail’s adjoining land, both during construction and after completion of works.

13.         The use of a suitably qualified arboricultural consultant is essential to provide acceptable supervision and monitoring in respect of the arboricultural issues in respect of the above condition. All works shall comply with the recommendations and guidelines contained within British Standard 5837.

14.         The use of landscape/arboricultural consultant is considered essential to provide acceptable submissions in respect of the above relevant conditions. Replacement planting of trees and shrubs shall be in keeping with the character and appearance of the locality. There is an opportunity to incorporate structural landscape trees into the scheme to provide for future amenity and long term continued structural tree cover in this area. It is expected that the replacement street trees will be of Advanced Nursery Stock sizes with initial planting heights of not less than 4.5m with girth measurements at 1m above ground level in excess of 16/18cm.

 